Paragon General Engineering — bull mark logo
SERVICES / FOCUS-02

HOA paving & concrete

Association drives, lots, and walkways phased so residents keep their parking.

HOA work is judged on two things a bid sheet does not show: whether residents could park, and whether the board got a straight answer about what the property actually needs. We phase association work so a drive is never fully closed, post notice ahead of each section, and sequence around trash pickup, emergency access, and the handful of residents who genuinely cannot walk an extra hundred feet.

For boards and managers, we bid to the reserve study rather than around it. California associations are required to review reserves on a regular cycle, and pavement is usually the largest line in the report — so we will tell you when a sealcoat cycle protects the component and when the section is gone and sealing it is throwing good money after bad. Multi-property managers get one point of contact and consistent unit pricing across the portfolio.

TYPICAL BUYERS
HOA boards · Community managers · Management companies
Quote this scope
Smooth newly replaced asphalt drive and resident parking area behind a multifamily community building
MULTIFAMILY DRIVE · ASPHALT REPLACEMENT
Association drive repaving
Resident parking lots
Sealcoat maintenance cycles
Crack fill programs
Concrete walkways
Sidewalk & tripping hazards
Curb and gutter repair
Red curb & fire lane marking
Guest stall striping
ADA access upgrades
Speed bumps & signage layout
Phased multi-year plans
HOW WE BUILD IT

Standards & verification

ACCESS
Phased sections — the drive never fully closes
NOTICE
Resident notice and signage posted ahead of each phase
EMERGENCY
Fire lane access maintained throughout the work
REOPEN
Sealcoat typically back in service in 24 hours
BUDGETING
Scoped to the reserve study, spread across budget years
PORTFOLIO
One point of contact, consistent unit pricing
COMMON QUESTIONS

Before you call

Will residents lose parking during the work?+

Not all at once. We phase association work section by section so there is always somewhere to park, post notice and signage ahead of each phase, and schedule around trash pickup and emergency access. On tight properties we run nights or weekends for the sections that cannot close during the day.

How soon can residents drive on it?+

Sealcoat typically reopens in about 24 hours, asphalt paving the same day once it has cooled, and concrete flatwork at 7 days for vehicle traffic. We phase pours so no one is landlocked.

Can you present to our board?+

Yes. We provide a line-item written scope with quantities, materials, and a schedule that a board can read without a translator, and we will walk the property with the board or manager before it goes to vote.

Do we need to repave, or will sealcoat hold?+

It depends on whether the base is still sound. Sealcoat is preventive — it protects a surface that still has structure under it. If the section has failed, sealing it just hides the failure for a season. We walk the property and tell you which one you have, in writing.

RELATED TRADES
REQUEST A QUOTE

Four steps. Two minutes.

NO OBLIGATION · FREE ESTIMATE
REPLY WITHIN 30 MINUTES
01Service
02Location
03Details
04Contact
STEP 01 / 04 · ONE TAP

What do you need done?

Not sure which? Pick the closest — we will sort it on the call.
CALL (408) 905-4805Request a quote